Implementation of all-way stops - intersection of Montée Dalton and rue du Sous-Bois - Rivière-Blanche electoral district - Jean Lessard
The committee approved the installation of all-way stop signs at the intersection of Montée Dalton and rue du Sous-Bois to improve traffic safety, as detailed in plan CRO-25-277.
other
Temporary modification to traffic and parking regulations for Aéro Gatineau-Ottawa - September 12 to 14, 2025
The committee authorized temporary traffic and parking changes near the Gatineau-Ottawa Executive Airport for the Aéro Gatineau-Ottawa air show from September 12 to 14, 2025. This includes 'no parking' zones on several streets and the creation of a temporary third lane on specific road segments to manage event traffic.
transitculture
Additional Funding - Bell Canada Pole Relocation (Montée Dalton)
This item authorizes additional funding for the relocation of utility poles by Bell Canada on Montée Dalton. The project has no net budgetary impact.
infrastructure
Authorize a cost adjustment - No budgetary impact - Tender 2020 SP 203 - Couillard Construction ltée - Road resurfacing of Montée Dalton, between Chemin Proulx and Chemin du 6e rang
This item authorizes a cost adjustment for the road resurfacing project on Montée Dalton. As there is no budgetary impact, this is a routine administrative adjustment to an existing contract with Couillard Construction ltée.
infrastructurebudget
Authorize a cost adjustment - No budgetary impact - Tender 2020 SP 203 - Couillard Construction ltée - Road resurfacing of Montée Dalton, between Chemins Proulx and du 6e Rang - Rivière-Blanche District - Jean Lessard
The city is approving additional costs for the road resurfacing project on Montée Dalton. This adjustment covers extra work recommended by the engineering firm and does not require new budget allocation, bringing the total contract value to $3,246,711.37.
infrastructurebudget