"air conditioning"

7 agenda items mention this keyword

Tender 2025 SP 416 - Replacement of the air conditioning system at the Daniel-Lafortune building (G509) - Project 19-2008 - Pointe-Gatineau electoral district - Marc Carrière
This item concerns the awarding of a contract for replacing the air conditioning system at the municipal Daniel-Lafortune building. This is a routine infrastructure maintenance project located in the Pointe-Gatineau district.
infrastructure
Tender 2025 SP 416 - Replacement of the air conditioning system at the Daniel-Lafortune building (G509) - Project 19-2008 - Infrastructure and Projects Department - Pointe-Gatineau District - Marc Carrière
The city has awarded a contract to Séguin Morris inc. for $298,869.86 to replace the air conditioning system at the Daniel-Lafortune building.
infrastructure
Authorize the treasurer to draw the necessary funds from the life cycle reserve to finance temporary and urgent air conditioning equipment for the Paul-Pelletier aquatic center - Deschênes electoral district - Caroline Murray
The City is authorizing up to $200,000 from the life cycle reserve for urgent air quality and cooling improvements at the Paul-Pelletier aquatic center. These temporary measures are necessary ahead of planned 2026 upgrades.
budgetinfrastructure
Authorize the treasurer to draw the necessary funds from the lifecycle reserve to finance temporary and urgent air conditioning equipment for the Paul-Pelletier aquatic center - Deschênes District - Caroline Murray
This item authorizes the use of lifecycle reserve funds to pay for urgent, temporary air conditioning at the Paul-Pelletier aquatic center to ensure the facility remains operational.
budgetinfrastructure
Authorize the Treasurer to draw funds from the Life Cycle Reserve to finance temporary and urgent air conditioning equipment for the Paul-Pelletier Aquatic Centre - Deschênes Electoral District - Caroline Murray
Council approved up to $200,000 in emergency funding from the Life Cycle Reserve to install temporary air conditioning and dehumidification equipment at the Paul-Pelletier Aquatic Centre. This measure is necessary to ensure air quality until major upgrades, already planned for 2026, can be completed.
infrastructurebudget
Authorize the treasurer to draw necessary funds from the Lifecycle Reserve to urgently finance air conditioning equipment for the Paul-Pelletier Aquatic Centre - Deschênes electoral district - Caroline Murray
The city is authorizing up to $175,000 from the Lifecycle Reserve for emergency installation of temporary air conditioning at the Paul-Pelletier Aquatic Centre. This work was not originally planned in the 2024-2028 investment cycle.
infrastructurebudget
CES - Authorize the treasurer to draw the necessary funds from the lifecycle reserve to urgently finance air conditioning equipment for the Paul-Pelletier aquatic center - Deschênes electoral district - Caroline Murray
The city is authorizing emergency funding from the lifecycle reserve to install air conditioning at the Paul-Pelletier aquatic center in the Deschênes district, represented by Councillor Caroline Murray.
infrastructurebudget