Authorization of a Cost Adjustment, No Budgetary Impact - Tender 2021 SP 001 - Lot 5 Works - Wastewater Treatment Plant Refurbishment Program, Gatineau Sector
The committee approved additional costs totaling $288,270.36 for the ongoing refurbishment of the Gatineau sector wastewater treatment plant. These costs stem from several change orders recommended by the consultant, WSP Canada inc. This adjustment does not require new budget allocation as it is covered by existing funds.
infrastructurebudget
Authorization of a Cost Adjustment, No Budgetary Impact - Tender 2022 SP 387 - Mechanical and Electrical Professional Services - Paul-Pelletier Aquatic Centre Upgrades, Phase II
The committee approved an additional $32,618.41 for professional engineering services related to the mechanical and electrical upgrades at the Paul-Pelletier Aquatic Centre. This covers additional required services and does not impact the overall budget.
infrastructurebudget
Authorization of an Additional Amount - Tender 2020 SP 381 - Professional Services - Environmental Impact Study for the Four-Lane Widening of Boulevard La Vérendrye Ouest
The committee approved an additional $22,967.41 for WSP Canada inc. to perform additional acoustic modeling and mitigation assessments required by the provincial environment ministry for the widening project of Boulevard La Vérendrye Ouest.
infrastructureenvironmentbudget
Authorize a cost adjustment, budget-neutral - Tender 2025 SP 501 - 6369472 Canada Inc. / Equinoxe JMP - Replacement of Culvert 1238, under Chemin de Montréal Ouest - Masson-Angers District - Michael Korhonen
The committee approved a cost increase of $69,765.05 for the replacement of culvert 1238 under Chemin de Montréal Ouest. This adjustment, along with a previously approved change order, brings the total contract adjustment to $79,758.56. The project remains budget-neutral.
infrastructurebudget
Authorize a cost adjustment, budget-neutral - Tender 2023 SP 217 - HVAC mechanical maintenance services - Public Works, Water and Residual Materials, and Infrastructure and Projects Departments
The committee approved additional costs for an HVAC maintenance contract with 3663981 Canada inc./Alpha Combustion. The total contract value is now $1,054,981.11, including a new adjustment of $186,454.37 to cover work performed prior to the contract's termination on January 4, 2026.
infrastructurebudget
Authorize a Cost Adjustment, Budget Neutral - Submission 2021 SP 086 - Professional Consulting Engineering Services - Touraine Pumping Station Refurbishment
The city is approving a cost adjustment of $151,474.83 for engineering services related to the Touraine pumping station refurbishment. This includes additional work for an access walkway, air purgers, and pipe repairs. The adjustment is budget-neutral.
infrastructurebudget
Authorize Additional Amount - 2025 SP 510 - Repair Work on Bar Screen #1 - Gatineau Wastewater Treatment Plant
The city is authorizing an additional $26,375.27 for repairs to bar screen #1 at the Gatineau wastewater treatment plant. This brings the total contract value to $290,150.92.
infrastructurebudget
Extension of an additional workload position as Special Projects Advisor, System Migration for the Information Technology Department for a period of 20 weeks
The Executive Committee approved a 20-week extension for a temporary Special Projects Advisor position within the IT department. This extension involves a salary expenditure of $42,344, bringing the total project cost above the $250,000 threshold that requires committee authorization.
governance
Extension of an additional workload position as Advisor, Psychological Health at Work for the Human Resources Department for a period of four months
The committee approved a four-month extension for a temporary Psychological Health at Work Advisor position in the Human Resources department. The $34,923 cost brings the total expenditure for this role above the $250,000 threshold.
governance
Creation of a temporary additional workload position as IT Project Director for the Information Technology Department for a period of 32 months
The committee authorized the creation of a 32-month temporary IT Project Director position. The $366,520 cost will be funded through the 2023-2027 Capital Works Program (PDI).
governancebudget
Authorization of an Additional Amount - Tender 2024 SP 067 - Maintenance of the Video Surveillance System for Real Estate Assets - Real Estate Department
The city is authorizing an additional $80,000 for the maintenance of its video surveillance system for real estate assets. This increase is due to security breaches and the need for enhanced physical security at city sites, bringing the total contract value to $203,193.64.
infrastructurebudget
Authorization of an Additional Amount - Tender 2021 SP 297 - Repair and Maintenance Services for Arena Refrigeration Systems - Public Works Department
The city is authorizing an additional $142,366.94 for urgent repairs to refrigeration systems in three arenas (Jean-Paul-Sabourin, Stade-Pierre-Lafontaine, and Centre sportif de Buckingham). This brings the total contract value with Cimco Réfrigération to $1,085,593.71.
infrastructurebudget
Authorize a cost adjustment for professional consulting engineering fees, no budgetary impact - Tender 2018 SP 033 - Municipal services on rue Amherst, between boulevard Saint-Joseph and ruisseau de la Brasserie
The committee approved an additional $174,156.08 in professional fees for CIMA+ regarding municipal service work on rue Amherst. This adjustment, along with a previously approved delegation of power, brings the total cumulative adjustments to $213,990.32, with no net impact on the city budget.
budgetinfrastructure
Authorize a cost adjustment for professional consulting engineering fees, no budgetary impact - Tender 2021 SP 069 - Replacement of the culvert under rue Maclaren Ouest
The committee approved an additional $37,611.77 in professional fees for CIMA+ for the rue Maclaren Ouest culvert replacement project. This covers unexpected work, such as a retaining wall, and brings the total cumulative adjustments to $64,381.86 with no net budgetary impact.
budgetinfrastructure
Authorize a cost adjustment, with no budgetary impact - Tender 2022 SP 387 - Mechanical and electrical professional services - Paul-Pelletier Aquatic Centre - Upgrading, Phase II
The committee approved an additional $35,642.25 for professional mechanical and electrical engineering services for the Paul-Pelletier Aquatic Centre upgrade project. This adjustment, along with a previously approved delegation of power, brings the total contract value to $166,713.75. There is no additional budgetary impact for this increase.
infrastructurebudget
Notice of motion and tabling of draft Bylaw 816-5-2025 amending Bylaw 816-2017 regarding the delegation of authority from the executive committee to certain officials, including the power to authorize expenditures and enter into contracts on behalf of the City of Gatineau, in order to repeal section 5
This item serves as a formal notice of motion to amend a city bylaw regarding the delegation of financial and contractual powers to city officials. Specifically, it proposes the repeal of section 5 of *Règlement 816-2017*, which governs how the executive committee delegates its authority.
governance
Notice of Motion and Filing of Draft Bylaw 816-5-2025 Amending Bylaw 816-2017 Concerning the Delegation of Power from the Executive Committee to Certain Officials, Including the Power to Authorize Expenses and Enter into Contracts on Behalf of the City of Gatineau, to Repeal Article 5
Councillor Steve Moran gave notice of motion to amend Bylaw 816-2017, which governs the delegation of financial and contractual powers to city officials. The proposed amendment, Bylaw 816-5-2025, aims to repeal Article 5 of the existing regulation.
governance
$5,000 Grant for Graduation Party and Montreal Trip - Grade 6 Class of St-Jean-Bosco School
Councillor Jocelyn Blondin has approved a $5,000 grant from his discretionary budget to support the graduation party and a three-day trip to Montreal for the Grade 6 class at St-Jean-Bosco School.
culturegovernance
Authorize a bid cost adjustment with no budgetary impact - Eurovia Québec Construction inc. - Reconstruction of Boulevard Maloney Est, between Promenade du Lac-Beauchamp and Rue Dupuis
The city is approving additional costs for the reconstruction of Boulevard Maloney Est. The total adjustment of $542,228.13 (including previous and new work) is covered within existing budgets, resulting in no net impact on the city's finances. The revised total contract value is $10,226,532.85.
infrastructurebudget
Authorize a cost adjustment, with no budgetary impact - Tender 2020 SP 369 - Professional consulting engineering services - Environmental rehabilitation and soil decontamination - Fonderie site
The city is approving an additional $251,041.86 for professional engineering services provided by WSP Canada inc. for the environmental cleanup of the Fonderie site. This covers extra work including environmental monitoring, chemical analysis, and risk assessment related to contaminated materials found at 211, rue Montcalm. The adjustment has no net budgetary impact.
environmentinfrastructure
Authorization of a Cost Adjustment for Construction Work, No Budgetary Impact - Submission 2022 SP 339 - Lucy-Faris Library - 115, Rue Principale, Aylmer Sector
The City is approving an additional $531,284.80 for construction costs at the Lucy-Faris Library project in Aylmer. This covers change orders and additional work, bringing the total contract value to $42,812,624.64, with no impact on the city budget.
infrastructurebudget
Authorize a cost adjustment for tender 2020 SP 436, with budgetary impact - 6369472 Canada inc. - Reconstruction of Sentier du Vallon, between Chemins des Érables and Lebaudy - Limbour District - Louis Sabourin
The city is approving additional costs for the reconstruction of Sentier du Vallon. This adjustment covers extra work required for the project, bringing the total contract value to $1,503,496.46. This item has a budgetary impact.
infrastructurebudget
Authorize a cost adjustment for tender 2023 SP 099, no budgetary impact - Paysagiste Envert et Fils - Sentier du Lièvre Ouest - Phase I - Infrastructure and Projects Department - Buckingham District - Edmond Leclerc
The city is approving an additional $140,095.11 for the Sentier du Lièvre Ouest Phase I project. This covers extra work required for the construction of multi-purpose trails and road markings, bringing the total contract value to $909,749.26.
infrastructurebudget
$20,000 grant - Project to bring artists and citizens together through an experimental art laboratory at the Centre d'Art Contemporain de l'Outaouais - Orée-du-Parc District - Isabelle N. Miron
The city is approving a $20,000 grant from Councillor Isabelle N. Miron's discretionary budget to the Centre d'Art Contemporain de l'Outaouais. The funds will support an experimental art laboratory project aimed at fostering connections between artists and citizens.
culturebudget
Authorization of Additional Funds - Tender 2016 SP 300 - Transport and Processing of Compostable Materials
The city is authorizing an additional $2,000,000 to cover increased costs for the transport and processing of compostable materials handled by Services Matrec inc. This adjustment is necessary to meet ongoing service demands and brings the total contract value to approximately $18.38 million.
environmentbudget