This contract concerns the development of vacant land located within the Pointe-Gatineau floodplain. The project aims to manage these spaces safely given their vulnerability to flooding.
This item approves a budget-neutral cost adjustment for the road reconstruction project on Mont-Bleu Boulevard, between Cité-des-Jeunes and Saint-Joseph boulevards. The work is being carried out by Eurovia Québec Construction inc.
This item awards a contract for the reconstruction of Champlain Street, aimed at improving road conditions in the Hull-Wright district.
The city is launching a pilot project to test a non-reservation, self-service car-sharing model, which aims to provide residents with more flexible transportation options.
This item approves updates to parking signage on various streets to prepare for the 2026 winter parking regulations, ensuring residents are aware of seasonal restrictions.
The city is purchasing a new patrol boat and a trailer, which will be used by municipal services for water-based operations or safety patrols.
The city is purchasing two new fire pump trucks to upgrade the firefighting fleet and ensure public safety capabilities are maintained.
This is a routine administrative item to approve the city's expenditures totaling $11,769,911 for the specified week in September 2025.
This item authorizes a cost adjustment for the ongoing renovation of the Gatineau wastewater treatment plant. The adjustment is budget-neutral, meaning it does not require additional funding beyond what was previously allocated.
This contract concerns the development of vacant land located within the Pointe-Gatineau floodplain. The project aims to manage these spaces safely given their vulnerability to flooding.
The city is granting a temporary exemption to the noise by-law for the company Nordmec. This allows them to perform construction work outside of standard permitted hours during the fall of 2025.
This item approves a budget-neutral cost adjustment for the road reconstruction project on Mont-Bleu Boulevard, between Cité-des-Jeunes and Saint-Joseph boulevards. The work is being carried out by Eurovia Québec Construction inc.
This item awards a contract for the reconstruction of Champlain Street, aimed at improving road conditions in the Hull-Wright district.
This contract covers the renovation of the Sentier du Moulin (Mill Trail) to ensure its continued safety and accessibility for residents.
The city is launching a pilot project to test a non-reservation, self-service car-sharing model, which aims to provide residents with more flexible transportation options.
This item approves updates to parking signage on various streets to prepare for the 2026 winter parking regulations, ensuring residents are aware of seasonal restrictions.
The city is purchasing specialized parts for its SW4S sidewalk snow groomers to ensure equipment is ready for winter maintenance operations.
The city is awarding a direct contract for the purchase, installation, and commissioning of a driving simulator, likely for training purposes for municipal staff.
This contract provides for the on-demand rental of wheel loaders without operators, allowing the city to supplement its fleet during peak maintenance periods.
Council is asked to approve additional funds for an existing contract regarding roof maintenance and repairs for municipal buildings.
The city is purchasing a new patrol boat and a trailer, which will be used by municipal services for water-based operations or safety patrols.
The city is purchasing two new fire pump trucks to upgrade the firefighting fleet and ensure public safety capabilities are maintained.
This is a routine administrative item to approve the city's expenditures totaling $11,769,911 for the specified week in September 2025.
This contract covers the procurement of electrical supplies, including street lighting parts and cabling, necessary for the maintenance of city infrastructure.